call us: 888-392-5233

Boker Magnum Long Lead EDC Black G10 Folding Knife

MSRP: $41.95
$32.95
$25.75
(You save $16.20 )
(0) Write a Review
SKU:
BO01SC080
Adding to cart… The item has been added

OUT OF STOCK

Description

Boker Magnum Long Lead EDC Black G10 Folding Knife is a modern knife designed to meet all your cutting needs. This knife features a handle made of black G10, ensuring comfort and a secure grip while using this knife. The blade made of 8Cr13MoV stainless steel can be opened by nail nick. This blade is tough and is sure to get the job done. This attractive, sleek knife slides easily into your pocket, ready for use.

This knife features a pocket clip for tip-down, right side carry only. 

FEATURES:

  • Satin, spear point blade made of 7Cr17MoV steel.
  • Nail nick opener.
  • Black G-10 handle with stainless steel hardware.
  • Tip-down pocket clip for secure carry.

SPECIFICATIONS:

  • Blade Length: 3.15"
  • Overall Length: 7.24"
  • Blade Material: 8Cr13MoV
  • Blade Finish: Satin
  • Handle Material: Black G10 
  • Locking Mechanism: Slipjoint
  • Weight: 2.75 oz

Reviews

There are no reviews for this product, to write a review click here.